Singapore Sports Hub

Project data

Location: Kallang, Singapore

Construction duration: 3 years, 7 months
High of the dome: 80 m
Diameter: 312 m
55.000 seats

Requirements

  • 250.000 cubic meters of concrete
  • 22 - 26 cranes

Customer

Dragages Singapore Pte Ltd

Customer's benefit

  • Safe
  • Flexible
  • High load bearing capacity
Mr Abhimandran Harendran / Mr Bernward Stube
Project Coordinator, Yongnam Engineering and Construction / Director, Dulan Asia Pacific Pte Ltd

The PERI UP Rosett Flex has proven to be a safe, flexible and productive system which supports and faciliates the installation of the structural steel roof for the stadium of the Singapore Sports Hub.

PERI solution

  • Fast and safe assembly via gravity lock
  • High load-bearing capacity due to special node rigidity and enormous loadability of the connection
  • Integrated lock against lifting and non-slip perforated surface for all decks

 

PERI systems in use